Welcome to visitJiangsu Polar Bear Machinery Co., Ltd.!
National Advisory Hotline:
13616132343
Contact Us
Support Hotline
13616132343

Contact: Manager Zhang

Mobile: 13616132343

E-mail: bjx6006@163.com

URL: www.jsbjxjx.com

Address: No. 68, Yongyi Road, Chengnan Park, Jingjiang City

What are the operating precautions of large flat vulcanizer?
来源:www.jsbjxjx.com 发表时间:2019-09-21

1. The operator of the platform operated by solenoid valve must not disturb the solenoid valve. In case of failure, the operator must find electrical and instrumentation personnel to repair. Before repair, the power supply must be cut off.

2. When the pull-out machine and splint are started, the bell is ringing and the scream is contacted first. If no reply is received, the pull-out machine shall not be started. In operation, hands should not be put into splints. No splint or button is allowed for non-local personnel. When the front and rear puller starts, the operator is 0.5 meters away from the roller.

3. When changing the cushion iron, it should be stable and accurate, and should not exert too much force. Before changing the cushion iron in series, people around the pot head must be notified to avoid hurting people.

4. When picking up the top iron, it must be done after the middle hot plate and the upper hot plate are completely separated. After all the top iron is picked up, the iron plate can be lowered.

5. When turning the iron plate in the pot, the hand should not be extended into the pot. When the pot is up, the distance between the upper and lower hot plates should be within 10 centimeters, and the hand should not be extended between the hot plates. If problems are found, the machine should stop to deal with them.

6. When you take the iron rod for coiling the finished product, you should hold it firmly. When walking, pay attention to underground obstacles, and pay attention to light handling, to avoid smashing hands and feet.

7. When starting the packing machine, check before and after to prevent injuries. When leading, two people must be 0.5 meters away from the roller. Cooperate well with each other. After you nod the lead, drive again.

8. When lifting a finished product, check whether the wire rope is damaged or not. When lifting, signal must be sent first. No one is allowed to stand under the transporter. When hanging semi-finished products, the wire rope must be hung in the groove of the roll.

9. When lifting semi-finished products on the guide rack, two persons must operate in the same direction of the gap on both sides of the guide rack. After putting it in place, the card sleeve should be blocked.

10. When using an electric drill or a dish scrubber, it is necessary to check whether it is safe and reliable, whether the electrical wiring is damaged or not, and if problems are found, it must be repaired before it is used.

11. When handling the dish scrubber, several people should cooperate well with each other and keep it stable. When changing sandpaper, the screw must be tightened, and the electrical switch should be responsible by a special person to avoid accidents.

12. Vulcanized nylon conveyor belt, cold fixed time and long belt is not allowed to travel to and from people.